No products in the cart.
new
Eurospec DSB8225LEB Security Door Bolt Long (LEAD TIME: 2-3 DAYS)
£ 33.53
Description
This item is on a direct delivery and will be delivered separately. They may also be subjected to longer lead times and cannot be amended, returned or cancelled once ordered.
Eurospec DSB8225LEB Security Door Bolt Long
Contract Door Security Bolt, (Long version) sometimes called a Rack Bolt. The bolt is morticed inside the door edge and can be locked or unlocked via a separate splined key or with a fixed splined turn. The bolt has an internal sawtooth rack mechanism int
Additional information
| Finish | Electro Brassed |
|---|---|
| Brand | Carlisle Brass |
Reviews (0)
Be the first to review “Eurospec DSB8225LEB Security Door Bolt Long (LEAD TIME: 2-3 DAYS)” Cancel reply
Reviews
There are no reviews yet.